BEGIN:VCALENDAR
PRODID:-//http://charlesriver.rowboston.com//NONSGML jCal Pro 2.2.9.469//
VERSION:2.0
BEGIN:VEVENT
UID:856f538879ae7fa24ba955ffbdc90526http://www.boatboston.org
DTSTAMP:20100904T195057Z
DESCRIPTION:Â· Â  Â  Â  Â  The anticipated schedule is as follows: <br /><s
 pan style='text-decoration: underline\;'>NHB(New Hampshire Boring) Barge W
 ork</span><br />o Â  Monday 3/22: Western Ave\, downstream side <br />o Â 
  Tuesday 3/23: Western Ave\, upstream side <br />o Â  Wednesday 3/24: Comp
 lete Western Avenue and begin work at River St (downstream side) <br />o Â
   Thursday 3/25: River St\, downstream side <br />o Â  Friday\, 3/26: Rive
 r St\, upstream sideÂ <br /><span style='text-decoration: underline\;'>DSI
  (Dive Team)</span>Â <br />o Â  Tuesday 3/23: Western Ave\, both sides <br
  />o Â  Wednesday 3/24: River St\, both sides\n<div>Â </div>\n<div>\n<div>
 <span style='text-decoration: underline\;'>Work Schedule:</span> <br />Whe
 n both teams are on site\, NHB and DSI will coordinate with each other to 
 phase the work in a way that minimizes interference with river traffic and
  to work on the same bridge and span when practical.Â </div>\n<div>Â Gener
 al work hours will be weekdays betweenÂ 8 am and 5pm.Â  At all times\, at 
 least one channel will remain open through both bridges.</div>\n<div>Â </d
 iv>\n<div>In the evenings\, the barge will be left at the bridges at a loc
 ation at the riverâ€™s edge to minimize interference with river traffic. L
 ights will be placed on the barge for visibility after dark\, unless the b
 arge returns to the put-in area at the end of the work day.Â NHB has been 
 notified that the upstream\, Cambridge side of the River Street Bridge is 
 the preferred location to leave the barge at the end of each day.</div>\n<
 /div>
DTEND:20100322T120000Z
DTSTART:20100322T120000Z
LAST-MODIFIED:20100321T124400Z
SUMMARY:Barge Work/Dive Team Work\, River and Western
END:VEVENT
BEGIN:VEVENT
UID:-1
DTSTAMP:20100904T195057Z
DESCRIPTION:Â· Â  Â  Â  Â  The anticipated schedule is as follows: <br /><s
 pan style='text-decoration: underline\;'>NHB(New Hampshire Boring) Barge W
 ork</span><br />o Â  Monday 3/22: Western Ave\, downstream side <br />o Â 
  Tuesday 3/23: Western Ave\, upstream side <br />o Â  Wednesday 3/24: Comp
 lete Western Avenue and begin work at River St (downstream side) <br />o Â
   Thursday 3/25: River St\, downstream side <br />o Â  Friday\, 3/26: Rive
 r St\, upstream sideÂ <br /><span style='text-decoration: underline\;'>DSI
  (Dive Team)</span>Â <br />o Â  Tuesday 3/23: Western Ave\, both sides <br
  />o Â  Wednesday 3/24: River St\, both sides\n<div>Â </div>\n<div>\n<div>
 <span style='text-decoration: underline\;'>Work Schedule:</span> <br />Whe
 n both teams are on site\, NHB and DSI will coordinate with each other to 
 phase the work in a way that minimizes interference with river traffic and
  to work on the same bridge and span when practical.Â </div>\n<div>Â Gener
 al work hours will be weekdays betweenÂ 8 am and 5pm.Â  At all times\, at 
 least one channel will remain open through both bridges.</div>\n<div>Â </d
 iv>\n<div>In the evenings\, the barge will be left at the bridges at a loc
 ation at the riverâ€™s edge to minimize interference with river traffic. L
 ights will be placed on the barge for visibility after dark\, unless the b
 arge returns to the put-in area at the end of the work day.Â NHB has been 
 notified that the upstream\, Cambridge side of the River Street Bridge is 
 the preferred location to leave the barge at the end of each day.</div>\n<
 /div>
DTEND:20100323T120000Z
DTSTART:20100323T120000Z
LAST-MODIFIED:20100321T124400Z
SUMMARY:Barge Work/Dive Team Work\, River and Western
END:VEVENT
BEGIN:VEVENT
UID:-2
DTSTAMP:20100904T195057Z
DESCRIPTION:Â· Â  Â  Â  Â  The anticipated schedule is as follows: <br /><s
 pan style='text-decoration: underline\;'>NHB(New Hampshire Boring) Barge W
 ork</span><br />o Â  Monday 3/22: Western Ave\, downstream side <br />o Â 
  Tuesday 3/23: Western Ave\, upstream side <br />o Â  Wednesday 3/24: Comp
 lete Western Avenue and begin work at River St (downstream side) <br />o Â
   Thursday 3/25: River St\, downstream side <br />o Â  Friday\, 3/26: Rive
 r St\, upstream sideÂ <br /><span style='text-decoration: underline\;'>DSI
  (Dive Team)</span>Â <br />o Â  Tuesday 3/23: Western Ave\, both sides <br
  />o Â  Wednesday 3/24: River St\, both sides\n<div>Â </div>\n<div>\n<div>
 <span style='text-decoration: underline\;'>Work Schedule:</span> <br />Whe
 n both teams are on site\, NHB and DSI will coordinate with each other to 
 phase the work in a way that minimizes interference with river traffic and
  to work on the same bridge and span when practical.Â </div>\n<div>Â Gener
 al work hours will be weekdays betweenÂ 8 am and 5pm.Â  At all times\, at 
 least one channel will remain open through both bridges.</div>\n<div>Â </d
 iv>\n<div>In the evenings\, the barge will be left at the bridges at a loc
 ation at the riverâ€™s edge to minimize interference with river traffic. L
 ights will be placed on the barge for visibility after dark\, unless the b
 arge returns to the put-in area at the end of the work day.Â NHB has been 
 notified that the upstream\, Cambridge side of the River Street Bridge is 
 the preferred location to leave the barge at the end of each day.</div>\n<
 /div>
DTEND:20100324T120000Z
DTSTART:20100324T120000Z
LAST-MODIFIED:20100321T124400Z
SUMMARY:Barge Work/Dive Team Work\, River and Western
END:VEVENT
BEGIN:VEVENT
UID:-3
DTSTAMP:20100904T195057Z
DESCRIPTION:Â· Â  Â  Â  Â  The anticipated schedule is as follows: <br /><s
 pan style='text-decoration: underline\;'>NHB(New Hampshire Boring) Barge W
 ork</span><br />o Â  Monday 3/22: Western Ave\, downstream side <br />o Â 
  Tuesday 3/23: Western Ave\, upstream side <br />o Â  Wednesday 3/24: Comp
 lete Western Avenue and begin work at River St (downstream side) <br />o Â
   Thursday 3/25: River St\, downstream side <br />o Â  Friday\, 3/26: Rive
 r St\, upstream sideÂ <br /><span style='text-decoration: underline\;'>DSI
  (Dive Team)</span>Â <br />o Â  Tuesday 3/23: Western Ave\, both sides <br
  />o Â  Wednesday 3/24: River St\, both sides\n<div>Â </div>\n<div>\n<div>
 <span style='text-decoration: underline\;'>Work Schedule:</span> <br />Whe
 n both teams are on site\, NHB and DSI will coordinate with each other to 
 phase the work in a way that minimizes interference with river traffic and
  to work on the same bridge and span when practical.Â </div>\n<div>Â Gener
 al work hours will be weekdays betweenÂ 8 am and 5pm.Â  At all times\, at 
 least one channel will remain open through both bridges.</div>\n<div>Â </d
 iv>\n<div>In the evenings\, the barge will be left at the bridges at a loc
 ation at the riverâ€™s edge to minimize interference with river traffic. L
 ights will be placed on the barge for visibility after dark\, unless the b
 arge returns to the put-in area at the end of the work day.Â NHB has been 
 notified that the upstream\, Cambridge side of the River Street Bridge is 
 the preferred location to leave the barge at the end of each day.</div>\n<
 /div>
DTEND:20100325T120000Z
DTSTART:20100325T120000Z
LAST-MODIFIED:20100321T124400Z
SUMMARY:Barge Work/Dive Team Work\, River and Western
END:VEVENT
BEGIN:VEVENT
UID:-4
DTSTAMP:20100904T195057Z
DESCRIPTION:Â· Â  Â  Â  Â  The anticipated schedule is as follows: <br /><s
 pan style='text-decoration: underline\;'>NHB(New Hampshire Boring) Barge W
 ork</span><br />o Â  Monday 3/22: Western Ave\, downstream side <br />o Â 
  Tuesday 3/23: Western Ave\, upstream side <br />o Â  Wednesday 3/24: Comp
 lete Western Avenue and begin work at River St (downstream side) <br />o Â
   Thursday 3/25: River St\, downstream side <br />o Â  Friday\, 3/26: Rive
 r St\, upstream sideÂ <br /><span style='text-decoration: underline\;'>DSI
  (Dive Team)</span>Â <br />o Â  Tuesday 3/23: Western Ave\, both sides <br
  />o Â  Wednesday 3/24: River St\, both sides\n<div>Â </div>\n<div>\n<div>
 <span style='text-decoration: underline\;'>Work Schedule:</span> <br />Whe
 n both teams are on site\, NHB and DSI will coordinate with each other to 
 phase the work in a way that minimizes interference with river traffic and
  to work on the same bridge and span when practical.Â </div>\n<div>Â Gener
 al work hours will be weekdays betweenÂ 8 am and 5pm.Â  At all times\, at 
 least one channel will remain open through both bridges.</div>\n<div>Â </d
 iv>\n<div>In the evenings\, the barge will be left at the bridges at a loc
 ation at the riverâ€™s edge to minimize interference with river traffic. L
 ights will be placed on the barge for visibility after dark\, unless the b
 arge returns to the put-in area at the end of the work day.Â NHB has been 
 notified that the upstream\, Cambridge side of the River Street Bridge is 
 the preferred location to leave the barge at the end of each day.</div>\n<
 /div>
DTEND:20100326T120000Z
DTSTART:20100326T120000Z
LAST-MODIFIED:20100321T124400Z
SUMMARY:Barge Work/Dive Team Work\, River and Western
END:VEVENT
BEGIN:VEVENT
UID:1c3c0fe40478b2fc701c41ad24f0c5bfhttp://www.boatboston.org
DTSTAMP:20100904T195057Z
DESCRIPTION:<p>Radcliffe LW V Buffalo</p>\n<p>4 races\, 15 minutes apart.</
 p>
DTEND:20100327T130000Z
DTSTART:20100327T120000Z
LAST-MODIFIED:20100316T135300Z
SUMMARY:college racing on 2K course
END:VEVENT
BEGIN:VEVENT
UID:6e8325e6d734a258d6595bc845cd6f5chttp://www.boatboston.org
DTSTAMP:20100904T195057Z
DESCRIPTION:@ MIT/Harvard\, between Mass Ave and Longfellow bridges
DTEND:20100327T183000Z
DTSTART:20100327T143000Z
LAST-MODIFIED:20100315T125200Z
SUMMARY:Boston Dinghy Club Challenge Cup sailing regatta
END:VEVENT
END:VCALENDAR